Get the latest tech news
Why the international experimental nuclear fusion reactor is in 'big trouble'
The 35-nation Iter project has a groundbreaking aim to create clean and limitless energy but it is turning into the ‘most delayed and cost-inflated science project in history’
That was initially the aim of the International Thermonuclear Experimental Reactor (Iter) which 35 countries – including European states, China, Russia and the US – agreed to build at Saint-Paul-lez-Durance in southern France at a starting cost of $6bn. Then huge sections of tokamak made in Korea were found not to fit together properly, while threats that there could be leaks of radioactive materials led the French nuclear regulators to call a halt on the plant’s construction. “The pandemic shut down factories supplying components, reduced the associated workforce, and triggered impacts – such as backlogs in shipping and challenges in conducting quality-control inspections,” admitted Iter’s director-general, Pietro Barabaschi.
Or read this on Hacker News